Company Introduction

Company Head Image Zoom

Company Head Image

Company Head Image

>>The global engineering company is dealt with foreign trade of wholesale business such as thermometer, pressure gauge, tapes, electric sensors, hydraulic coupling bolt, rebar taper coupler, pipe fittings(general valves, connectors, packings, o-rings, flexible hose, special valves) and so on.

 In addition, we are doing business with model(mock-up) for ship, engine, offshore and plant equipments and so on.Our business goods(commodities) are mainly used for marine engines, ships, off-shores, plants, power plants and others chemical industry and so on.


In future, we will carry out the ballast retrofitting for ship which is necessary to design for installation pipe line and to retrofit the ballast water treatment system with commissioning.

Detailed Company Information

  • Company NameGlobal Engineering Co., Ltd
  • Business Type
  • Year Established
  • LocationSouth Korea
  • Main Markets
  • Total Employees 1-50 People
  • Homepage www.globaleng7.com
  • PresidentDon Cheol Shin
  • Phone+82-52-265-2004
  • FAX+82-70-7500-9801
  • Address4 floor, joeun plaza building, maesanro 29, buk-gu, Ulsan city, korea
  • Product Category Chemicals > Adhesives & Sealants > Packing Sealing Adhesive Tapes
    Measurement & Analysis Instruments
    Measurement & Analysis Instruments > Temperature Instruments

Additional Introduction

The global engineering company is deal with wholesale business such as thermometer, pressure gauge, tapes, electric sensors, rebar coupler, lug cutting machine, industry automatic system, pipe fittings(general valves, connectors, packings, o-rings, flexible hose, special valves) and so on.


In addition, we are doing business with model(mock-up) for ship, engine, offshore and plant equippments and so on.

Our business goods(commodities) are mainly used for marine engines, ships, offshores, plants, power plants and others chemical industry and so on.

In future, we will carry out the ballast retrofitting which is necessary to design for installation pipe line and to retrofit the ballast water treatment system with commissioning.